Frequently Asked Questions

Answers to Help You Build with Confidence

There are many things to take into account when considering a construction project. Whether it’s a home extension, loft or garage conversion, house remodel, renovation or refurbishment, or building something completely bespoke, I’m sure you will have many questions.

From how much things cost, how long they take, the general process and much more, we’ve had questions a plenty fired at us over the years. We’ve therefore documented some of these below for those who have their own unanswered questions. Neatly categorised in their own respective subject area.

You can browse some of our frequently asked questions below, or if you would rather give us a call or an email, we would be happy to answer your burning questions there too.

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your Questions

Call Us

0114 312 2774

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your Extension Questions

Call Us

0114 312 2774

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your Conversion Questions

Call Us

0114 312 2774

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your Remodel Questions

Call Us

0114 312 2774

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your New Builds Questions

Call Us

0114 312 2774

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your Building Questions

Call Us

0114 312 2774

This would be assessed once we have had an initial conversation with yourself to discuss requirements, and also conducted a site visit.

The nature of the home remodel will dictate whether planning permission is required.  For the majority of internal home remodelling projects (such as knocking down, moving or erecting new walls) planning permission generally isn’t required. Exceptions however come into play when a property is listed, or falls within a conservation area.  Planning permission requirements are always discussed at the time of first contact with Outline Construction.

Typically, the bigger the project, the longer it will take.  If you are opting for a full home remodel, this will take longer than a stand-alone room remodel. Each of our home remodel projects are scoped out with in depth timelines during the consultation and quote stage.

Our home remodel projects vary depending on customer needs and requirements.  We have undertaken complete home remodels (altering the structure of entire houses), through to more stand-alone remodel projects, such as kitchen remodels, bathroom remodels, cellar, garage, and loft remodels.

Each house presents its own distinct characteristics. Consequently, the overall expense associated with remodelling a house can differ significantly. This is why we carry out in an in-depth consultation and site visit ahead of costing every project. From there, options, specs, timelines and costs can be discussed in further detail.

A remodel alters the structure of on object (in this case, a house).  This could be as simple as incorporating a new shower into an already established bathroom, through to removing an internal wall or changing the structural layout of a room.

A home renovation or refurbishment on the other hand, focuses on the restoration of something aged to a state of good condition, for example fixing a creaky door or floor, or interior design updates.

Many people mix these terms up (we agree, it’s an easy mistake to make). But whether you are opting for a remodel, renovation or refurbishment, the main thing is that the project is planned out accordingly. This is where Outline comes in.

Contact us to Discuss Your Questions

Call Us

0114 312 2774

Ready to discuss your own upcoming project?

We’re excited to hear about your ideas and help bring them to life. Get in touch with us today, and let’s start planning your next project together!

Ready to discuss your upcoming project?

We’re excited to hear about your ideas and help bring them to life. Get in touch with us today, and let’s start planning your next project together!

What Our Customers Say

"Just completed a major house remodel with Outline Construction, and I would not hesitate to recommend them. They were very professional, worked really well with us in residence, and their work is top quality."

Lee Kenny House Remodel

"Outline construction did a fantastic job of our build last August. We needed to knock through 3 walls to create a large family kitchen diner. Dom was spot on from start to finish, helping us choose materials, make decisions and was always available to chat things "

Sara Winder

"We could not be happier with Outline Construction, both with the design and the build itself. Everything has been finished to an exceptional standard and nothing was too much trouble for the team. All of the tradesmen were highly skilled, friendly and considerate."

Alice Webb